| Sl.No. |
Project
|
Client /Consultant
|
Scope
|
| 1. |
South Sumatra West Java Gas
Pipeline Project. Phase - I Indonesia
|
Nippon Steel Corporation / PGN
Indonesia.
|
Trenching and Backfilling for
installation of 32” Gas pipeline from South Sumatra
in Labuhan Maringgai to West Java in Bojonegara,
Indonesia for PGN. Total length of trenching is about
6.9 kms and the maximum depth of trench is about 3.5
mtr.
|
| 2. |
Uran-Trombay-Jawahardeep 36”
Crude Oil Pipeline near Mumbai, India
|
Punj Lloyd Limited / ONGC, India
|
Trenching and Backfilling for
installation of 36” crude oil pipeline near Mumbai,
India for ONGC. Total length of trenching is about 20
kms and the maximum depth of trench is about 12mtr.
|
| 3. |
NEAD Project, Abu Dhabi
|
NPCC / Technip
|
Trenching and Backfilling for
installation of offshore gas pipelines in Dhabiya gas
fields of Abu Dhabi, UAE. Total length of trenching is
11 kms pipe size is 14”, 12” and 8” and one
submarine optical fiber cable. Max depth of trench is
6mtr (Ongoing).
|
| 4. |
Tunu Field Development Project
Phase 9, Indonesia
|
PT Punj Lloyd Indonesia / TOTAL
E&P Indonesie
|
Access Dredging, Sea-bed
Preparation and Trenching for installation of 20”
gas pipeline of length 6 kms. The maximum depth of
trenching is 6mtr.
|
| 5. |
Panaran Pemping Gas Pipeline
Project, Indonesia
|
PT Punj Lloyd Indonesia / PGN
Indonesia
|
Seabed Preparation, Trenching and
Backfilling for installation of 26” gas pipeline
offshore length of 10 kms. Maximum depth of seabed
preparation is 24 mtr. Involves dredging in hard rock
too.
|
| 6. |
Pirpau Jetty to Jwahardweep
Submarine Pipelines (MOT), India
|
Hyundai
/
Mumbai
Port
Trust
|
Trenching for laying of offshore
pipelines (five numbers max size 42”) from Pirpau
Jetty to Jwahardweep (Butcher Island). Total length of
offshore trenching is about 4kms with bottom width of
trench being 32mtr. Involves dredging in hard rock.
|
| 7. |
Hazira Offshore Development –
Lakshmi Fields, India
|
Cairn Energy / Hyundai
|
Trenching and Backfilling for
installation of offshore gas pipeline in Lakshmi
Fields, India. Length of pipeline is 2 kms in water
depth up to 7 mtr
|
| 8. |
Hazira Offshore Development –
Niko Resources, India
|
Niko / Clough Offshore, Australia
|
Trenching and Backfilling for
installation of offshore gas pipeline near shore areas
in Hazira, India. Total length is 2050 mtr and maximum
depth of trench is 6 mtr.
|
| 9. |
Backfilling for Tunu Phase 8
Project, Indonesia.
|
TOTAL E&P / Pt Punj Lloyd
Indonesia
|
Backfilling of 24” gas pipeline
in a length of 2.5 kms. The maximum depth is 4 mtr in
severe current prone Nubi River area.
|