The Indian Dredging Company

Home

About us

Financials

Fleet

Careers

Contact



   Projects

Capital Dredging
Vizag Seaport Private Limited, Viskhapatnam Port Trust, India...

Pipeline Trenching
Nippon Steel Corporation / PGN Indonesia, Punj Lloyd Limited...

Land Reclamation
NTPC/BHELCrown Maritime-Batchy JV, HUDA Nagarjuna Construction...

Lakes & Reservoirs
Opening of seamouth, Chilka Lake Orissa, India...

Embankments
Noida Toll Bridge Co. Ltd...

Intake Channels
Dredging of Sea water cooling canal at Jamnagar...

De-Weeding Of Lakes
Upper and lower lakes at Bhopal,  India...

Flood Control
Krishna-Godavari Delta Basin, India...

Civil Projects
Construction of Fish landing centers, storage and filling sheds

    

Pipeline Trenching at Visakhapatnam  

Pipeline Trenching

Sl.No.

Project

Client /Consultant

Scope

1.

South Sumatra West Java Gas Pipeline Project. Phase - I Indonesia

Nippon Steel Corporation / PGN Indonesia.

Trenching and Backfilling for installation of 32” Gas pipeline from South Sumatra in Labuhan Maringgai to West Java in Bojonegara, Indonesia for PGN. Total length of trenching is about 6.9 kms and the maximum depth of trench is about 3.5 mtr.

2.

Uran-Trombay-Jawahardeep 36” Crude Oil Pipeline near Mumbai, India

Punj Lloyd Limited / ONGC, India

Trenching and Backfilling for installation of 36” crude oil pipeline near Mumbai, India for ONGC. Total length of trenching is about 20 kms and the maximum depth of trench is about 12mtr.

3.

NEAD Project, Abu Dhabi

NPCC / Technip

Trenching and Backfilling for installation of offshore gas pipelines in Dhabiya gas fields of Abu Dhabi, UAE. Total length of trenching is 11 kms pipe size is 14”, 12” and 8” and one submarine optical fiber cable. Max depth of trench is 6mtr (Ongoing).

4.

Tunu Field Development Project Phase 9, Indonesia

PT Punj Lloyd Indonesia / TOTAL E&P Indonesie

Access Dredging, Sea-bed Preparation and Trenching for installation of 20” gas pipeline of length 6 kms. The maximum depth of trenching is 6mtr.

5.

Panaran Pemping Gas Pipeline Project, Indonesia

PT Punj Lloyd Indonesia / PGN Indonesia

Seabed Preparation, Trenching and Backfilling for installation of 26” gas pipeline offshore length of 10 kms. Maximum depth of seabed preparation is 24 mtr. Involves dredging in hard rock too.

6.

Pirpau Jetty to Jwahardweep Submarine Pipelines (MOT), India

Hyundai / Mumbai Port Trust

Trenching for laying of offshore pipelines (five numbers max size 42”) from Pirpau Jetty to Jwahardweep (Butcher Island). Total length of offshore trenching is about 4kms with bottom width of trench being 32mtr. Involves dredging in hard rock.

7.

Hazira Offshore Development – Lakshmi Fields, India

Cairn Energy / Hyundai

Trenching and Backfilling for installation of offshore gas pipeline in Lakshmi Fields, India. Length of pipeline is 2 kms in water depth up to 7 mtr

8.

Hazira Offshore Development – Niko Resources, India

Niko / Clough Offshore, Australia

Trenching and Backfilling for installation of offshore gas pipeline near shore areas in Hazira, India. Total length is 2050 mtr and maximum depth of trench is 6 mtr.

9.

Backfilling for Tunu Phase 8 Project, Indonesia.

TOTAL E&P / Pt Punj Lloyd Indonesia

Backfilling of 24” gas pipeline in a length of 2.5 kms. The maximum depth is 4 mtr in severe current prone Nubi River area.